ENERGÉTICOS E INDUSTRIALES
BALBOA SIDERÚRGICAS AG
As a consequence of the electrical disturbances originating in the 20Kv distribution network, owned by the company, Pro Electrónica Sur, S.A.U was hired to carry out a study of transients with the purpose of introducing the necessary damping elements to suppress them.
AIRBUS
Design, manufacturing and maintenance of the remote control system for the A-380 tail stabilizer transport jig.
Sierra Brava hydroelectric power station
Consulting for basic and development electrical engineering including also the control software programming.
Electrical protection calculation.
Guadarranque solar farm
Basic engineering study and electrical protection calculation.
ALTADIS
Supply and complete electrical installation at the ALTADIS tobacco factory in Cádiz.
Bocachanza Pumping Station
Transient stability analysis in 66kV distribution network at the time of drive motor starting
Platform Jasmine
Electrical works execution.
Valdivia wind farm
Electrical protection calculation and detailed engineering.